Gatch Clinical Building Third Floor Renovation

Back to Listing

Gatch Hall

Gatch Hall

Campus:
IUPUI

Completion Date
August 20, 2009

Project Type:
Renovation

Primary Use:
Academic

Architect:
arcDESIGN

Team Leader:
Stuff

Project Budget

  • Internal funding: $1599100
  • Total budget: $1599100

Project Description

This project involved converting the existing laboratory space located on the west side of the third floor into private and open offices, updating the restroom facilities to be ADA-compliant, and creating a new conference space for the Division of Rheumatology. Critical upgrades included modernizing the heating, ventilation, and air-conditioning (HVAC) equipment; sizing the air handling unit to supply the second floor in the future; and extending the sprinkler system. New, fixed one-inch insulated-aluminum windows were installed in the west wing to match the building standard.