Jordan Hall Lab Renovations Phases I and II

Back to Listing

Jordan Hall

Jordan HallJordan HallJordan Hall
  • Jordan Hall
  • Jordan Hall
  • Jordan Hall

Campus:
IU Bloomington

Completion Date
April 25, 2013

Project Type:
Major Renovation

Primary Use:
Academic

Architect:
arcDESIGN

Team Leader:
Thompson

Project Budget

  • State funding: $9000000
  • Total budget: $9000000

Project Description

Laboratory space was renovated in Jordan Hall on Third Street on the IU Bloomington campus. Infrastructure improvements were made to the air handling and emergency power systems, and repairs were made to fix the chronic water infiltration problems under the existing rooftop greenhouses, which are located immediately above the new research laboratory functions. Approximately 15,000 assigned square feet (asf) was renovated, which includes the construction of a new classroom and teaching lab on the ground floor, the renovation of two research labs on the second and third floors, and the renovation of four research labs on the fourth floor.